25-Jan-22 |
338 |
116,275 |
Complete |
Cab |
Other |
Tires |
— |
— |
21-Jan-22 |
593 |
101,827 |
Complete |
Cab |
Repair, Replacement |
Brakes |
Front right rear brake chamber |
— |
20-Jan-22 |
593 |
100,450 |
Complete |
Cab |
Repair, Replacement, Installation |
Brakes |
— |
Replace actual hub on rear tandem on right side plus bearings and brake drum and bearings |
18-Jan-22 |
592 |
244,000 |
Complete |
Cab |
OIL CHANGE |
Engine |
oil filter |
Oil change |
18-Jan-22 |
593 |
101,717 |
Complete |
Cab |
OIL CHANGE |
Engine |
Fuel separator and fuel filter and air filter |
— |
18-Jan-22 |
594 |
29,717 |
Complete |
Cab |
OIL CHANGE |
Engine |
Oil filter and fuel filter and air filter |
— |
18-Jan-22 |
590 |
21,305 |
Complete |
Cab |
OIL CHANGE |
Engine |
oil filter, fuel filter, fuel filter separator, air filter |
— |
14-Jan-22 |
338 |
115,900 |
Complete |
Cab |
Replacement |
Tires |
trri, trro |
— |
07-Jan-22 |
592 |
243,500 |
Complete |
Packer |
GREASING / LUBE |
Body |
— |
Retroactive entry. |
07-Jan-22 |
593 |
101,400 |
Complete |
Packer |
GREASING / LUBE |
Body |
— |
Retroactive entry. |
07-Jan-22 |
594 |
29,500 |
Complete |
Packer |
GREASING / LUBE |
Body |
— |
Retroactive entry. |
07-Jan-22 |
590 |
20,500 |
Complete |
Packer |
GREASING / LUBE |
Body |
— |
Retroactive entry. |
02-Jan-22 |
594 |
9 |
Complete |
Packer |
Installation |
Hydraulics |
Tipper |
1 tipper
Retroactive service entry |
02-Jan-22 |
590 |
9 |
Complete |
Packer |
Installation |
Hydraulics |
Tipper |
Tipper |
02-Jan-22 |
592 |
9 |
Complete |
Packer |
Installation |
Hydraulics |
Tipper |
Tipper |
01-Jan-22 |
336 |
151,000 |
Complete |
Cab |
OIL CHANGE |
Engine |
oil filter |
— |
01-Jan-22 |
331 |
140,064 |
Complete |
Cab |
OIL CHANGE |
Engine |
oil filter |
— |
01-Jan-22 |
338 |
114,050 |
Complete |
Cab |
OIL CHANGE |
Engine |
oil filter |
— |
01-Jan-22 |
333 |
75,454 |
Complete |
Cab |
OIL CHANGE |
Engine |
oil filter |
— |
30-Dec-21 |
593 |
101,000 |
Complete |
Cab |
Repair, Replacement |
Other |
Blower fan |
— |
22-Dec-21 |
593 |
101,000 |
Complete |
Cab |
Repair, Replacement |
Body |
Install window crank and door handle on right side of cab interior |
— |
22-Dec-21 |
594 |
30,000 |
Complete |
Cab |
Repair |
Tires |
trli |
Plug tire |
21-Dec-21 |
592 |
243,000 |
Complete |
Packer |
Installation, Repair, Replacement |
Body |
Replace pin on right packing cylinder at blade |
— |
18-Dec-21 |
592 |
243,000 |
Complete |
Packer |
Installation |
Body |
Installed two tippers |
— |
18-Dec-21 |
594 |
29,000 |
Complete |
Packer |
Installation |
Body |
Installed to tippers |
— |